ZONGULDAK EREGLI WATER DRINKING WATER DISTRIBUTION PROJECT

EMPLOYER    : GÜNEŞOL İNŞAAT – DSİ – Drinking Water COMPLETED          : 2019 SCOPE                      : ELECTRICAL DESING and PLC and SCADA IMPLEMENTATION , 7 WATER STORAGE STATION 2 PUMP STATION TECHNICAL SPECIFICATION Manufacturing of the Electrical pamels for Water Storage station and pumping stations. Complete design of SCADA systems including manufacturing and commissioning of
Continue Reading →

Clarity 48mt – Classic II

EMPLOYER    : Bilgin Yachts Shipyard COMPLETED          : 2015 SCOPE                      : PREAPARING ELECTRICAL DESIGN and IMPLEMENTATION of ALARM&MONITORING SYSTEM TECHNICAL SPECIFICATION Launch name CLARITY CLASSIC Beam 8.50 m (27’10”) Current name CLARITY Draught 2.2m (7’3″) Year 2015 Fuel Capacity 30.800 lt. (8.150 US Gallons) Lenght 48.70m (159’77”) C
Continue Reading →
Translate »
error: Content is protected and some picture may include content third party copyright !