We start to test maybe the first open source process SCADA in the world. Originally developed in Sweden by Mandator and SSAB Oxelösund as a process control system based on standard computers. We are now testing the open source SCADA and beleive that open source is one of the key strat
1. Sync switch Auto Position 1.1. Load Balanced Power Operating Status- Automatic In our case, according to the selector switch on the load generators will be take over the load (1-86kW 2-86kW 3-28kW Mains 4-Shore) 4-position switch. If the demand power greater than the operatio
The communication is done with using Wago 750-881 PLC amd 750-658 Can gateway module. The use of the product detailed in this manual is exclusively geared to specialists having qualifications in PLC programming, electrical specialists or persons instructed by electrical specialists wh